Who needs to know, when installing an air source heat pump?

• Distribution Network Operator (DNO) (Electrical Supplier)

• Planning permission is not usually required but the unit must be positioned so as not to affect the appearance of the building

• Microgeneration Certification Scheme (MCS) possible grant funding

• Registered via Benchmark